The Fenwal Process

About Fenwal Protection systems

Since 1950, FENWAL has over installed over 8,000 explosion protection systems worldwide, that detect and suppress over 200 explosions per year.

                                                                                  

 

Site Visit

The industry's most experienced Explosion Specialists review your pre-defined hazard to gather data that will assure a Fenwal System that's matched to the specific application.

ProTECH Database

Using the world's largest body of information on combustible materials and explosion suppression parameters and concepts, we input your field data in order to test explosion protection approaches.

Computer Modeling

We then create a "worst case" explosion and suppression sequence in the computer model to assure that our chosen explosion protection approach meets your requirements.

System Design

Skilled Fenwal Engineers, employing the latest in computer-assisted design methods, specify the optimum system (or combination of systems) for each application.

Applications Engineering

Precise support and documentation (including preparation of system drawings and step-by-step installation instructions) are provided along with on-site design and a pre-installation meeting to ensure a smooth installation.

Installation and System Commissioning

We provide the on-site services of a Fenwal Field Engineer to check out the installation and calibrate your Fenwal System.

Maintenance

Factory-certified Fenwal Service Engineers are located throughout the country to meet provisions of your Fenwal Maintenance Contract and provide quick response service.

Emergency Services

Fenwal and your nearby Authorized Fenwal Service Center are sources for 24-hour emergency services, recharging supplies and spare parts.

Training

Fenwal offers on-site training programs for the proper operation of your Fenwal system.